Planned works

In connection with the scheduled work for razvitii TM-29, will be turned off hot water supply system at St. Valencia-Spain 3A, 3/2, St. Kenesary 1, 4, Shevchenko str. 4,4/1,6,6/1,8,8/1,8/2, the residential complex "Mont Blanc", MZHK "Shyganak", ul., D. 7 (MOR-9, GS-1, others-4) (contractor JSC "Astana-Teplotranzit»)

Reason: Planned work

Beginning: 27.05.2019 г. 03:19 ч.
Ending: 27.05.2019 г. 23:00 ч.

Planned works

In connection with the planned work to replace the site t/Tr D=150 mm., the hot water system will be turned off at the address Satpaeva street 1, 1/1, 3, 3, Petrov street 5/3 (MZHD-5) (contractor JSC "Astana-Teplotransit»)

Reason: Planned work

Beginning: 27.05.2019 г. 03:15 ч.
Ending: 27.05.2019 г. 22:30 ч.

Planned works

JSC "Astana-Teplotransit" informs about planned shutdown of heat supply to the DHW from 27-31.05.2019 in connection with the tests on the density of TM 6,21,23,24,26. R. Almaty, Yesil, Baikonur (control) (transferred 23.05.2019 in 08-46) TM 6,21,23,24,26, test works, under shutdown: Abylaikhan Ave. 9, 5A, 9/1, 9/2, 11, 11/3, 11/4, 2/2, 11/1, 11/2, 5/1, 5/2, 5/3,19/2,23,41,33,17/1,39/1,3/1,3,19/1,29/1,43/1,41/1,17,17 a,39,17 b,19, 27/1,29/2,19/3,25,41/2,37,25/1,25/2,27/4;7,3, 5, 13/1, 7/1, 7/5, 27/3, 15, 5/3,31,27, 43, 29,23/2,41/3,19/4,35, 37/1,43/1; kudaiberdyuly Ave. 2, 2/1, 2A,2/6,2/7, 4, 4/3, 4/4, 14, 18, 20, 22, 24/1,24,2/2, 6/1, 2/4, 6, 16, 18a, 26,14 a,8, 10, 12; zhansuguruly street 6/1,6/2, 8/3, 4/4, 4/1, 4/2; 4, 3, 7, 10/1, 8,8/1, 8/2, 2, 2/1, 4/3, 4/2, 6/1,12,1,3,8,10,10/2; kazhymukana str. 2, 13/1, 1; 13, 13A; Kuishi Dina 44, 42, 40, 40/1,37, 1, 1/1, 2/1, 2/2, 3/1, 5, 5/1, 7, 36/1, 36, 36/3, 38, 39,39/1,36/2,42/2,44/2,35, 12, 13,14, 15,12/1, 12/2, 8, 8/1,4, 4/1, 4/2;14,41, 37/1, 11/1, 2, 3, 9, 37A, ; Petrov street 2, 2/1, 4, 12, 12/1,12/2,12/3, 14, 14/1, 14/2, 14/3 LCD Orbit, 2/2, 8/1; street maylina 3/2, 3, 5, 5/1,13, 11/1, 9, 7, 5/2, 7/1;1, 4,4/1,11; Satpayev street 17, 17/1, 17/2; Munaitpasova street 2, 4, 6, 6/1, 8/1; 15 MD.d. 26; beysekbaeva str. 1/3; Tauelsizdik Ave. 4/3, 8/1, 6/2, 6/3, 12/1, 12/2, 14, 14/1, 14/2, 16, 20, 22, 24A, 24B, 6/1, 8, 12, 26, 26/1, 28, 31/2,21,21/4,21/5,21/6; 4, 4/1, 4/3, 11/1, 11/2, 11/3, 13, 13/1, 8, 6/1, 9, 9a, 6, 3/1;4,15,13/2, 6, 9a, 9, 7, 18.14 a,31,4 a,8/1,1,1/2,3/1,1/1, 1A,1B,1B,34,4/1,4/2,6,10,16/1,20/1,24,28/1,30 a; 1, 1/2, 3/1, 1/1, 1, 1A, 1B, 1C, 3, 4, 4/1, 4/2, 5, 6, 10, 13, 16/1, 18, 9, 11, 20/1, 21, 24, 30A;33,32,7,17/3,3; St. Charles De Голя1,1A,3,3A,5,7,9,11, shop "Gardens and orchards",19/1,13; St. Tokerau 8,10,1 2, MD. Akbulak-3 D. 34, 35, 36; , per 40-8. 1, lane 40-7., 1., 40/1, d. 11, d. 8, lane 40-7 D. 4,6, 9a,Akbulak 3 Charles De Gaulle Business Centre, Akbulak-2ЖК"Parisian quarter", the PCB AK Bulak-2" D. 2, 3, 4, 5, 6, 7;Sarkyrama 3, 3/1, 7, 10,11, 12; Сарыкенгир2 lane, 1.1 m/1.3 m, LCD "British quarter", lane. Sarkyrama 4,1/1,1/2,1/3, MD. AK-Bulak-2, Charles De Gaulle str. 1 LCD 5 stars, Asan Kaiga str. 01, tarkhana str. 4, 10, Tokpanova str. 7, 41, railway in the district of Gar.cooperative "South",10 Office "Kazgrazhdan project",23/1,35,37,39,29,27,25,23,21,19,11,7,3,1,5,9,13,20, AK Bulak-4 Uch. 8, kravtsova1 Str., 1/2,1/1,14/1, Astrakhan str. 21, Tashenov str. 17,17/1,19,21/3,23, Taha Hussein street 2,2 a,2/1,2/2,2/3; Aray35/1,35 a,35B,25: MD. Chubary street 89 d. 11,16, Normandie-Niemen 1,9, 2,2/1,7,8,9,10,11,12, MZHK "LightHouse", SWC pioneer LCD "Milan quarter" residential complex "Gazovik"MOR "Bavaria", str Романтиков23, 19,15,13,11,9,7,5,3,25,21,16,14,27;str Arencibia 14/1,14/2,14/6, 14/5, 16/1, 14/3, 4, 9/1; St. Amman 2,2 a,2B,4,6, street Jalairi 34,35,36,2,8,7; street Tussocky 1A,1B,3,11; St. Teshiktash 1,4,d 3,5,5/1,6, 7/1,8 sq 1,2,9,9 a,9/1; St. Taldy 2,4; St. Zhusan d. 9,11; Makatayev str., 7/3, 7,9, mosque "al-Ghani", Khludov str., 1, Per.Squadron "Fund Demeu", Pushkina str. 27, 31, 33; Solenable 217, Torgovaya str. 4, St. Aliyev 2/2,2/4,10; 15 munaytpasov str., 17/1; St. Beisekbaeva 5A, 5B; share bike 20; St. Arasan 01, 2/2: Daraboz str 35, Amman street 8 business center "Milano", Tashenov street 4,21,21/1,23/1,25,27 St. Kravtsov 18,32/1,26; St. Аккент5,6,6 a,12; St. Balkashinskiy 8; St. Taha Hussein 6/1, street Tarkhan 2,2 a,2B,2D,4,6/1,6/2; Arai Ave 33/1, St. Zhaukazyn 5, St. Serper 2,4,6,8,1,12,14,18,16/1; 5 Momyshuly St.(Palace of Schoolchildren), 5A; St. Elim-ay 12,14,16,18, St. Aray 25,31/1,48,54, equipment 13. Ul. Zhukovsky 4,6; Tengiz street 4/2,10,6,4/2,8,12,14; St. Mercy 14,12,13,11,10,9,7,8,6,5,3,2,1; St. Sports 3,5,7,9,11,10 b,8,6,4, 2 Vysotskogo str 2,16,14,8,73,17,15,13,11,9,7,5,2/2,1,1/1,12,6(73); street Trading 3/2,3,11,13,5/1,8,6,19,21,17,9,12,2/1,08,2; St. Жирек4,6,8,10,11,12,14,9,7,5,3;: St. Алпамыс15,17,19,16,18,22,24,10,6,5,1,3,7;St. Арасан5/1,14,4/1,6/1,7/1,11,13,2/1,1,2,3,4,7 sq 1,2,6,9,9 a; St. Ulken 13,10,1,2,3,6,8,11, 5; str Patterned 7,3,5,6,4,2,1; St. Shukshin 15,11,9,7,3,5,1,1/1,20,18,16,14,12,10,8,6,4,2, 2/1, 1/2, St. Cats Batir 7, Horticultural building 65, 57, 59, 51, 53, 49, 45, 47, 39, 67, 63, 55, 37, 33, 31,43; St. Современников10,8,6,4,2,5,7,3,1;building Initiative 20,18,14,12,10,8,5,4 and,4,28,24; St. Саргуль14,16,12,10,8,1/3, 1/1,3/1,2/4,2/5,3,17,15,13,11,6, 4, 2, 2/2, 2/1, 1, 2/3; , St. Сарыкенгир2,4,4/1,4 a, and 6,8,20; str Talkaround 11, Amman str 1,2,2 a,2B,4,6,5/1,5 a, Daraboz str 1,5,7,9,13, 23, 25, 29, no. 12, lane 40-8., 2, St 40-10 d .12, 23/1,20; TRANS. Tashoky5,5/1, 7,11,9, MD Mr. AK Булак4 D. 10,12,14,16/1,18,16; Серпер1,2,6,8,10,12,14,16/1,18, Akkent 4, Маккинский6,7,8,9,16,18; 23 Astrakhan, street Esil 9,10,11,11/1,12,13,14 and Balkashinskiy 4,14, 15,16,17,19,24 settlement, Energetikov ul. Energetikov 1,7,9,11,13,10,8,6,4, Zhaukazyn 2,3,6 a,7, Амман1,2,2 a,2B,4,6,5/1,Starting 2,2/2,2/3,2 and,2G,3,5,6,7,8,8 and,9,10,11,12,13,14, Spring 6,9,11,13/1, Koktem 12, Mereke 1, 2, street Cats Batyr 7. W/d-249, h/d-398,PR-224 2.Abylaykhan 25/3,Petrov 8,Kuusinena 6.SHK.-3 Kudayberdyuly 22/1,abylaykhana 23/1,Akbulak 2 d. 11, Tauelsizdik 14/3, maylina 3/1,5/2,Zhaukazyn 6, Kuishi Dina 38/1; I/s -8, 4. Abylaikhan 1,15, Tauelsizdik 3/1, 11/1, 11/2, 11/3.Paul-ka-6 (executor of JSC "Astana-Teplotransit»)

Reason: The list of objects disconnected for the period of tests 27.05. – 31.05.2019 g

Beginning: 27.05.2019 г. 03:07 ч.
Ending: 27.05.2019 г. 23:59 ч.

Planned works

In connection with the planned overhaul of the substation "Zarechnaya" the ball. 219, will be a power failure at: W/M "Thalmann": LCD "Adina" St. Zhaisan 13 LCD "Ecovillage" street Selma 19-19/6, street Selma, St. Akzhan, St. Mugalzhar, St. Zhaisan, lane Burelli, St. Akkemer, St. Anyrakay, School lane, St Konyrolen(contractor JSC "Astana-REK»)

Reason: Planned work

Beginning: 27.05.2019 г. 03:04 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with the planned work on the installation of metering devices on TP-2946 , electricity will be turned off at the address: koksay street (contractor LLP "Aventis Group»)

  • District АЛМАТЫ, улица Коксай, ДОМ

Reason: Planned work

Beginning: 27.05.2019 г. 03:01 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with the planned overhaul of the SS "School" ball.105 , will be a power failure at the following address: Karbysheva str., St. Medeu, ul M. dzhalilya, St. Zhukova, Bartold str., Kokterek St., Karbyshev St., St. Horde, Chekhov street (performer JSC "Astana-REK»)

Reason: Planned work

Beginning: 27.05.2019 г. 02:58 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with the planned work on the installation of metering devices on TP-119 feeder shutdown, electricity will be turned off at Brusilovsky street, Volgograd lane, Zhubanov street, Kenesary street, Odessa lane, Sevastopol lane, Tchaikovsky lane (Performer: LLP "Kazakhstan Wolong")

Reason: Planned work

Beginning: 27.05.2019 г. 02:56 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with the planned overhaul on the RP "Kirov" Yach.18 will be a power failure at: W/M "Koktal-2": str Arkalyk, St Mynzhylky street Ulytau, street Barchyn, St. Akmola, Zaisan street, St. Aksuat, street Nauryz str Akmola, street farm, the street, Aksu, Torgau str, str Garcian, St. Moiyldy, St. Saryozen, St. Dulatov, St. Tastic, St. Karasu, street pulse, ul Kaynar, St. Zhezdy, str, Aktobe, str., str Saumalkol', str Kulanotpes, Tlendiev St. 12 (contractor JSC "Astana-REK»)

Reason: Planned work

Beginning: 27.05.2019 г. 02:52 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with carrying out planned maintenance work on KTP-745 will be a power failure at: W/M "Koktal-2": str Tarbagatai, St. Tastic, St. Zhezdy, St. Mohanty (contractor JSC "Astana-REK»)

  • District САРЫАРКА, улица Тарбагатай, ДОМ
  • District САРЫАРКА, улица Тастак, ДОМ
  • District САРЫАРКА, улица Жезди, ДОМ
  • District САРЫАРКА, улица Моншакты, ДОМ

Reason: Planned work

Beginning: 27.05.2019 г. 02:46 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with the planned repair work to comment on KTP-2171, 1СШ, 2СШ be off the electricity at the address: Bogenbay St. of the 24/2. (W/C "Harmony"). (artist too "Aventis Group»)

  • District САРЫАРКА, проспект Богенбай Батыра, ДОМ 24/2

Reason: Planned work

Beginning: 27.05.2019 г. 02:42 ч.
Ending: 27.05.2019 г. 18:00 ч.