Events in Nur-Sultan

Expand filter

Planned works

In connection with the planned work on the TP-977 will be disconnected power supply to the following addresses: MD.The South-East, right side, lane Shabyt lane Sartau, Zhankent street, St. Taykazan.

Reason: Planned work

Beginning: 26.03.2019 г. 10:30 ч.
Ending: 26.03.2019 г. 11:30 ч.

Emergency works

26.03.2019, 05-45ч. in connection with the carrying out of emergency works on the substation "City" Yach. 403-TP-340 stopped the supply of electricity at the following address: Bogenbai Batyr Avenue, St. Kazakhstan, sh.

Reason: Emergency shutdown

Beginning: 26.03.2019 г. 05:45 ч.
Ending: 26.03.2019 г. 10:45 ч.

Emergency works

25.03.2019 with 16-48h. in connection with the carrying out of emergency works on the substation "Koktem" stopped the supply of electricity at the following addresses: to the South of Tlendiyev Ave., St 188 St 187.

Reason: Emergency shutdown

Beginning: 25.03.2019 г. 16:48 ч.
Ending: 25.03.2019 г. 20:00 ч.

Weather conditions

The Department of emergency situations of the city of Nur Sultan reports that according to RSE "Kazhydromet" on March 26 fog remains at times.

Reason: Weather conditions

Beginning: 25.03.2019 г. 16:00 ч.
Ending: 26.03.2019 г. 23:00 ч.

Emergency works

25.03.2019 G. 11-00pm. in connection with the damage to the water pipe l=100mm at the address: Mayakovskogo 3A stopped the water supply at the following addresses: R. Almaty. GM "Railway", the street, Aktasty, Zhabayev, bitter, Akzhar.

Reason: Emergency shutdown

Beginning: 25.03.2019 г. 11:00 ч.
Ending: 25.03.2019 г. 15:00 ч.

Emergency works

R. Almaty. GM "Train", Mayakovskogo street 3A. The rush of water-Yes, D=100 mm under the trip: the street Ecstasty, Zhabaev str, str, str Akzhar.

Reason: Emergency shutdown

Beginning: 24.03.2019 г. 19:30 ч.
Ending: 24.03.2019 г. 01:15 ч.

Emergency works

24.03.2019, 15-45 h in connection with the carrying out of emergency works off electricity at the following addresses: R. He is a great poet.Production, piece Kemengeruly, St jelly, Pierre.February, Ust-Kamenogorsk Ore. Pine, it.Cartopac, Pierre.Shagan, he said.He's old, he's old.Matrosov, she said.Kusala lane Kostanay, street Industrial, 1Кокчетавская street Centralasiae, he said.Sochi, he said.Aksengir, he said.Tien Shan, Kerbulak lane, Pierre.Yolks, tubes.Arshaly, Lenin str., 1Акбидай, Pierre.Flat.

Reason: Emergency shutdown

Beginning: 24.03.2019 г. 14:30 ч.
Ending: 24.03.2019 г. 16:58 ч.

Emergency works

R. Baikonur. Ul. Zhetigen 3/1. Gust of water-Yes D=400 mm., under off. W/M "Ondiris", Taiburyl str., St. CARICOM.

Reason: Emergency shutdown

Beginning: 24.03.2019 г. 14:25 ч.
Ending: 24.03.2019 г. 22:00 ч.

Information about public transport

Dear residents and guests of the capital! Since March 24, due to the mismatch of the road surface, bus routes No. 4, 15, 22A will temporarily run according to the above traffic scheme.

Reason: Change of the scheme of movement of the Shuttle bus

Beginning: 24.03.2019 г. 12:00 ч.
Ending: 25.03.2019 г. 23:30 ч.

City event

Dear football fans! March 24 will be organized submission of special" Shuttle-Bus "buses to the football match of the national teams "Kazakhstan" - "Russia". Bus departure time-18: 15-19: 00 HH.; Place of delivery – the Stadium "Astana-arena". The rally point: Parking "SC "Kazakhstan"; Parking "Mosque "Nur Astana"; Parking "Capital circus". The fare on special "Shuttle-Bus" buses is the same as on public transport. We ask you to plan your trip in advance, focusing on the above departure time of buses.

Reason: The movement of buses

Beginning: 23.03.2019 г. 20:00 ч.