Events in Nur-Sultan

Expand filter

Weather conditions

The Department of emergency situations of the city of Nur Sultan reports that according to RSE "Kazhydromet" 5-6 June at times expected storm, squall, hail. Wind West, North-West, gusts 15-20 m/s.

Reason: Storm warning

Beginning: 04.06.2019 г. 00:00 ч.
Ending: 06.06.2019 г. 23:30 ч.

Weather conditions

The Department of emergency situations of the city of Nur Sultan reports that according to RSE "Kazhydromet" in the afternoon of June 04 storm is expected.

Reason: Storm warning

Beginning: 03.06.2019 г. 15:30 ч.
Ending: 04.06.2019 г. 10:30 ч.

Weather conditions

The Department of emergency situations of the city of Nur Sultan reports that according to RSE "Kazhydromet" in the afternoon on June 1 storm, hail is expected. Wind South-West with the transition to the North-West, Northern gusts of 16 m/s.

Reason: Storm warning

Beginning: 31.05.2019 г. 16:30 ч.
Ending: 01.06.2019 г. 23:30 ч.

Planned works

In connection with the planned work for the re-cutting of t/Tr D=250 mm., the hot water system will be disconnected at the address: Ryskulbekov street 11, 11/1, 11/2, 11/3, 11/4, 13,15, 17;kuishi Dina street 44/3, 46/3, 46, 46/1, 46/2, PR. Kudaiberduly 28,38,36,36/1,36/3 (MZHD-8, OO-1, proeche9) (executor of JSC " Astana-Teplotransit»)

Reason: Planned work

Beginning: 27.05.2019 г. 03:22 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with the scheduled work for razvitii TM-29, will be turned off hot water supply system at St. Valencia-Spain 3A, 3/2, St. Kenesary 1, 4, Shevchenko str. 4,4/1,6,6/1,8,8/1,8/2, the residential complex "Mont Blanc", MZHK "Shyganak", ul., D. 7 (MOR-9, GS-1, others-4) (contractor JSC "Astana-Teplotranzit»)

Reason: Planned work

Beginning: 27.05.2019 г. 03:19 ч.
Ending: 27.05.2019 г. 23:00 ч.

Planned works

In connection with the planned work to replace the site t/Tr D=150 mm., the hot water system will be turned off at the address Satpaeva street 1, 1/1, 3, 3, Petrov street 5/3 (MZHD-5) (contractor JSC "Astana-Teplotransit»)

Reason: Planned work

Beginning: 27.05.2019 г. 03:15 ч.
Ending: 27.05.2019 г. 22:30 ч.

Planned works

JSC "Astana-Teplotransit" informs about planned shutdown of heat supply to the DHW from 27-31.05.2019 in connection with the tests on the density of TM 6,21,23,24,26. R. Almaty, Yesil, Baikonur (control) (transferred 23.05.2019 in 08-46) TM 6,21,23,24,26, test works, under shutdown: Abylaikhan Ave. 9, 5A, 9/1, 9/2, 11, 11/3, 11/4, 2/2, 11/1, 11/2, 5/1, 5/2, 5/3,19/2,23,41,33,17/1,39/1,3/1,3,19/1,29/1,43/1,41/1,17,17 a,39,17 b,19, 27/1,29/2,19/3,25,41/2,37,25/1,25/2,27/4;7,3, 5, 13/1, 7/1, 7/5, 27/3, 15, 5/3,31,27, 43, 29,23/2,41/3,19/4,35, 37/1,43/1; kudaiberdyuly Ave. 2, 2/1, 2A,2/6,2/7, 4, 4/3, 4/4, 14, 18, 20, 22, 24/1,24,2/2, 6/1, 2/4, 6, 16, 18a, 26,14 a,8, 10, 12; zhansuguruly street 6/1,6/2, 8/3, 4/4, 4/1, 4/2; 4, 3, 7, 10/1, 8,8/1, 8/2, 2, 2/1, 4/3, 4/2, 6/1,12,1,3,8,10,10/2; kazhymukana str. 2, 13/1, 1; 13, 13A; Kuishi Dina 44, 42, 40, 40/1,37, 1, 1/1, 2/1, 2/2, 3/1, 5, 5/1, 7, 36/1, 36, 36/3, 38, 39,39/1,36/2,42/2,44/2,35, 12, 13,14, 15,12/1, 12/2, 8, 8/1,4, 4/1, 4/2;14,41, 37/1, 11/1, 2, 3, 9, 37A, ; Petrov street 2, 2/1, 4, 12, 12/1,12/2,12/3, 14, 14/1, 14/2, 14/3 LCD Orbit, 2/2, 8/1; street maylina 3/2, 3, 5, 5/1,13, 11/1, 9, 7, 5/2, 7/1;1, 4,4/1,11; Satpayev street 17, 17/1, 17/2; Munaitpasova street 2, 4, 6, 6/1, 8/1; 15 MD.d. 26; beysekbaeva str. 1/3; Tauelsizdik Ave. 4/3, 8/1, 6/2, 6/3, 12/1, 12/2, 14, 14/1, 14/2, 16, 20, 22, 24A, 24B, 6/1, 8, 12, 26, 26/1, 28, 31/2,21,21/4,21/5,21/6; 4, 4/1, 4/3, 11/1, 11/2, 11/3, 13, 13/1, 8, 6/1, 9, 9a, 6, 3/1;4,15,13/2, 6, 9a, 9, 7, 18.14 a,31,4 a,8/1,1,1/2,3/1,1/1, 1A,1B,1B,34,4/1,4/2,6,10,16/1,20/1,24,28/1,30 a; 1, 1/2, 3/1, 1/1, 1, 1A, 1B, 1C, 3, 4, 4/1, 4/2, 5, 6, 10, 13, 16/1, 18, 9, 11, 20/1, 21, 24, 30A;33,32,7,17/3,3; St. Charles De Голя1,1A,3,3A,5,7,9,11, shop "Gardens and orchards",19/1,13; St. Tokerau 8,10,1 2, MD. Akbulak-3 D. 34, 35, 36; , per 40-8. 1, lane 40-7., 1., 40/1, d. 11, d. 8, lane 40-7 D. 4,6, 9a,Akbulak 3 Charles De Gaulle Business Centre, Akbulak-2ЖК"Parisian quarter", the PCB AK Bulak-2" D. 2, 3, 4, 5, 6, 7;Sarkyrama 3, 3/1, 7, 10,11, 12; Сарыкенгир2 lane, 1.1 m/1.3 m, LCD "British quarter", lane. Sarkyrama 4,1/1,1/2,1/3, MD. AK-Bulak-2, Charles De Gaulle str. 1 LCD 5 stars, Asan Kaiga str. 01, tarkhana str. 4, 10, Tokpanova str. 7, 41, railway in the district of Gar.cooperative "South",10 Office "Kazgrazhdan project",23/1,35,37,39,29,27,25,23,21,19,11,7,3,1,5,9,13,20, AK Bulak-4 Uch. 8, kravtsova1 Str., 1/2,1/1,14/1, Astrakhan str. 21, Tashenov str. 17,17/1,19,21/3,23, Taha Hussein street 2,2 a,2/1,2/2,2/3; Aray35/1,35 a,35B,25: MD. Chubary street 89 d. 11,16, Normandie-Niemen 1,9, 2,2/1,7,8,9,10,11,12, MZHK "LightHouse", SWC pioneer LCD "Milan quarter" residential complex "Gazovik"MOR "Bavaria", str Романтиков23, 19,15,13,11,9,7,5,3,25,21,16,14,27;str Arencibia 14/1,14/2,14/6, 14/5, 16/1, 14/3, 4, 9/1; St. Amman 2,2 a,2B,4,6, street Jalairi 34,35,36,2,8,7; street Tussocky 1A,1B,3,11; St. Teshiktash 1,4,d 3,5,5/1,6, 7/1,8 sq 1,2,9,9 a,9/1; St. Taldy 2,4; St. Zhusan d. 9,11; Makatayev str., 7/3, 7,9, mosque "al-Ghani", Khludov str., 1, Per.Squadron "Fund Demeu", Pushkina str. 27, 31, 33; Solenable 217, Torgovaya str. 4, St. Aliyev 2/2,2/4,10; 15 munaytpasov str., 17/1; St. Beisekbaeva 5A, 5B; share bike 20; St. Arasan 01, 2/2: Daraboz str 35, Amman street 8 business center "Milano", Tashenov street 4,21,21/1,23/1,25,27 St. Kravtsov 18,32/1,26; St. Аккент5,6,6 a,12; St. Balkashinskiy 8; St. Taha Hussein 6/1, street Tarkhan 2,2 a,2B,2D,4,6/1,6/2; Arai Ave 33/1, St. Zhaukazyn 5, St. Serper 2,4,6,8,1,12,14,18,16/1; 5 Momyshuly St.(Palace of Schoolchildren), 5A; St. Elim-ay 12,14,16,18, St. Aray 25,31/1,48,54, equipment 13. Ul. Zhukovsky 4,6; Tengiz street 4/2,10,6,4/2,8,12,14; St. Mercy 14,12,13,11,10,9,7,8,6,5,3,2,1; St. Sports 3,5,7,9,11,10 b,8,6,4, 2 Vysotskogo str 2,16,14,8,73,17,15,13,11,9,7,5,2/2,1,1/1,12,6(73); street Trading 3/2,3,11,13,5/1,8,6,19,21,17,9,12,2/1,08,2; St. Жирек4,6,8,10,11,12,14,9,7,5,3;: St. Алпамыс15,17,19,16,18,22,24,10,6,5,1,3,7;St. Арасан5/1,14,4/1,6/1,7/1,11,13,2/1,1,2,3,4,7 sq 1,2,6,9,9 a; St. Ulken 13,10,1,2,3,6,8,11, 5; str Patterned 7,3,5,6,4,2,1; St. Shukshin 15,11,9,7,3,5,1,1/1,20,18,16,14,12,10,8,6,4,2, 2/1, 1/2, St. Cats Batir 7, Horticultural building 65, 57, 59, 51, 53, 49, 45, 47, 39, 67, 63, 55, 37, 33, 31,43; St. Современников10,8,6,4,2,5,7,3,1;building Initiative 20,18,14,12,10,8,5,4 and,4,28,24; St. Саргуль14,16,12,10,8,1/3, 1/1,3/1,2/4,2/5,3,17,15,13,11,6, 4, 2, 2/2, 2/1, 1, 2/3; , St. Сарыкенгир2,4,4/1,4 a, and 6,8,20; str Talkaround 11, Amman str 1,2,2 a,2B,4,6,5/1,5 a, Daraboz str 1,5,7,9,13, 23, 25, 29, no. 12, lane 40-8., 2, St 40-10 d .12, 23/1,20; TRANS. Tashoky5,5/1, 7,11,9, MD Mr. AK Булак4 D. 10,12,14,16/1,18,16; Серпер1,2,6,8,10,12,14,16/1,18, Akkent 4, Маккинский6,7,8,9,16,18; 23 Astrakhan, street Esil 9,10,11,11/1,12,13,14 and Balkashinskiy 4,14, 15,16,17,19,24 settlement, Energetikov ul. Energetikov 1,7,9,11,13,10,8,6,4, Zhaukazyn 2,3,6 a,7, Амман1,2,2 a,2B,4,6,5/1,Starting 2,2/2,2/3,2 and,2G,3,5,6,7,8,8 and,9,10,11,12,13,14, Spring 6,9,11,13/1, Koktem 12, Mereke 1, 2, street Cats Batyr 7. W/d-249, h/d-398,PR-224 2.Abylaykhan 25/3,Petrov 8,Kuusinena 6.SHK.-3 Kudayberdyuly 22/1,abylaykhana 23/1,Akbulak 2 d. 11, Tauelsizdik 14/3, maylina 3/1,5/2,Zhaukazyn 6, Kuishi Dina 38/1; I/s -8, 4. Abylaikhan 1,15, Tauelsizdik 3/1, 11/1, 11/2, 11/3.Paul-ka-6 (executor of JSC "Astana-Teplotransit»)

Reason: The list of objects disconnected for the period of tests 27.05. – 31.05.2019 g

Beginning: 27.05.2019 г. 03:07 ч.
Ending: 27.05.2019 г. 23:59 ч.

Planned works

In connection with the planned overhaul of the substation "Zarechnaya" the ball. 219, will be a power failure at: W/M "Thalmann": LCD "Adina" St. Zhaisan 13 LCD "Ecovillage" street Selma 19-19/6, street Selma, St. Akzhan, St. Mugalzhar, St. Zhaisan, lane Burelli, St. Akkemer, St. Anyrakay, School lane, St Konyrolen(contractor JSC "Astana-REK»)

Reason: Planned work

Beginning: 27.05.2019 г. 03:04 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with the planned work on the installation of metering devices on TP-2946 , electricity will be turned off at the address: koksay street (contractor LLP "Aventis Group»)

  • District АЛМАТЫ, улица Коксай, ДОМ

Reason: Planned work

Beginning: 27.05.2019 г. 03:01 ч.
Ending: 27.05.2019 г. 18:00 ч.

Planned works

In connection with the planned overhaul of the SS "School" ball.105 , will be a power failure at the following address: Karbysheva str., St. Medeu, ul M. dzhalilya, St. Zhukova, Bartold str., Kokterek St., Karbyshev St., St. Horde, Chekhov street (performer JSC "Astana-REK»)

Reason: Planned work

Beginning: 27.05.2019 г. 02:58 ч.
Ending: 27.05.2019 г. 18:00 ч.